Power Supply System Design

01 Development and approval with the Customer of the design specification (terms of reference).
02 Collection of initial data for design, including geodetic and geological surveys.
03 Development of all necessary sections of the design documentation.
04 Development of estimate documentation for the construction of the facility.
05 Approval of the design and estimate documentation in all services involved in supervising the construction of the facility.
06 Support during the project's review at Ukrderzhbudekspertyza until a positive conclusion is obtained.
07 Carrying out author's supervision of the project implementation process.
08 Technical consultations throughout the entire life cycle of the project implementation.

Information about design

Commissioning houses and buildings is impossible without connection to the power grid. This requires not only the appropriate equipment but also a competent external power supply project. You can order it from LK-Energy. The company’s experienced staff will create a document for any facility, taking into account all technical features.

Structure of the power supply project and types of facilities

Electrical network design is carried out in order to create optimal conditions for supplying electricity to the facility. The documentation specifies all the necessary technical solutions for this. The specialists develop:

  • a description of the characteristics of the equipment required for power supply;
  • material specifications;
  • diagrams of the systems connected to the grid.

The information for each section is created taking into account the features of the premises. In order to organize a correct grid connection, the characteristics of switchgear, cables, transformers and other devices are determined at the design stage.

The types of materials are also specified, with a detailed listing of features and standards. A separate section of the project is devoted to a detailed description of the electrical system. It describes the distribution of loads and the characteristics of the devices. When the design of external power supply networks is at the final stage, a cost estimate is prepared.

It contains information about the cost of implementing the project, in particular the equipment, materials and works. Power supply system design is carried out for various categories of facilities. In particular, the service is available for infrastructure facilities. These can be highways, railway stations, airports.

The specialists also create documentation for alternative electricity stations (wind and solar). They have extensive experience and know all the nuances of how the systems function, so they can develop a complete set of documents for structures of various levels of complexity.

In addition, we carry out the design of power networks for energy facilities, educational and medical institutions, enterprises (including industrial ones) and urban infrastructure. For each of the listed facilities, the experts create technically correct projects that ensure uninterrupted operation of the system.

Stages of external power supply design

At the first stage, all the details are discussed with the customer and the terms of reference are drawn up. Next, the facility, its structural features and the power supply requirements are studied. The specialists also calculate the necessary load and collect the required data, in particular geological and geodetic surveys.

The next stage is the development of the power supply project. The specialists create diagrams for the placement and connection of electrical equipment on the site. They describe in detail the installation locations and the cable routing. When the documents are ready, the specialists prepare a cost estimate that indicates the final amount. Next, the experts approve the documentation in various services.

After that, the technicians begin installing the structures. The installation is carried out using modern equipment and in accordance with the developed diagrams. Before full launch, the equipment is tested. If all systems work correctly, the system is put into operation.

Timeframes for developing an electrical project

To carry out external power supply design, time is needed to study the initial data from the facility and to create the documentation. Simpler projects, such as external power supply design, are completed within approximately 2 weeks.

The design of external power supply networks for technically more complex structures takes up to 2 months. During this period, a complete set of documents is developed that can be used for installation.

What does the cost of developing an electrical project depend on?

The company’s team uses an individual approach to each client. This is how the cost of the project is formed too. After all, several factors determined by the characteristics of the facility are taken into account during the calculation. Having decided to order a power supply project, take into account several aspects that affect the price:

  • the complexity of the power supply system;
  • the scope of work;
  • the client’s requirements and wishes;
  • the need to use special equipment.

In addition, the final cost is affected by recommendations from professional engineers and consultants, as well as logistics costs and the costs of ordering equipment. An accurate calculation can be made by the company’s experts. You can contact them in two ways: through a callback request on the website or by phone.

Why order power supply design from LK-Energy?

You can confidently entrust the design of electrical installations to the LK-Energy team. Highly qualified experts will be able to develop a competent set of documents for the facility, taking into account all requirements. By cooperating with us, you get the following advantages:

  • application of modern technologies;
  • performance of work within strictly set deadlines;
  • compliance with regulations and standards in the field of power supply.

To find out the details, get a consultation and order an electrical project, contact the company’s manager. Contacts for communication are on the website. We will answer all questions and help implement a grid connection project of any complexity.

Frequently asked questions

Changes are possible at the initial stages, but they require agreement with the customer and, possibly, a revision of the budget.

In that case, it is possible to revise the requirements, use more economical solutions or look for additional sources of financing.

During development, modern standards and environmental requirements are taken into account, including the possibility of using renewable sources.

A guarantee of compliance with technical requirements and standards is usually provided. But by ordering a project from LK-Energy, you receive additional guarantees of the ergonomics of the design.