A solar power plant (PV plant) for your enterprise from LK Energy Group cuts production costs through on-site generation during daytime. We have built turnkey since 2005: design, approvals, installation and commissioning, all in-house, and we run our own switchgear manufacturing. We size the plant to your consumption profile — grid-tied, hybrid or with energy storage. Submit a request and we'll calculate the savings and timeline for your production.

icon
For the home

Generate electricity independent of the common power supply grid, for full autonomy from state tariffs.

It is like installing a generator that uses solar energy instead of fuel.

icon
For income

Additional income from net-metering surpluses fed into the grid (subject to an agreement with the DSO). The payback period depends on tariffs and operating conditions.

icon
Turnkey

Additional income from net-metering surpluses fed into the grid (subject to an agreement with the DSO). The payback period depends on tariffs and operating conditions.

SPPs BY CAPACITY TYPE

Hybrid solar power plant with batteries, 20 kW capacity

Hybrid solar power plant with batteries, 20 kW capacity

  • Price: from $11,500
Learn more
Grid-tied solar power plant, 30 kW capacity

Grid-tied solar power plant, 30 kW capacity

  • Price: from $13,000
Learn more
Hybrid solar power plant with batteries, 30 kW capacity

Hybrid solar power plant with batteries, 30 kW capacity

  • Price: from $19,500
Learn more
Hybrid solar power plant with batteries, 50 kW capacity

Hybrid solar power plant with batteries, 50 kW capacity

  • Price: from $31,000
Learn more
Grid-Tied 100 kW Solar Power Plant

Grid-Tied 100 kW Solar Power Plant

  • Price: from $46,000
Learn more
Hybrid solar power plant with batteries, 100 kW capacity

Hybrid solar power plant with batteries, 100 kW capacity

  • Price: from $70,000
Learn more
Hybrid solar power plant with batteries, 200 kW capacity

Hybrid solar power plant with batteries, 200 kW capacity

  • Price: from $180,600
Learn more

WHICH BUSINESSES SHOULD USE SOLAR POWER PLANTS

  • Industrial and manufacturing enterprises
  • Commercial buildings and offices
  • Hotels and restaurants
  • Supermarkets, shopping centres, shops
  • Petrol stations and car parks
  • Farms and agricultural facilities
  • Warehouses and logistics centres
  • For any business that consumes more than 50 kW per month.

It is really profitable. You can see this for yourself by ordering a calculation from us for a solar power plant for your type of business.

Learn more

info-img
Popular SPP solutions for business

Grid-tied solar power plant 50 kW

Turnkey SPP price from $21,250

Price per 1 kW of installed turnkey capacity — from $425

SPP specifications:

  • Longi solar modules — 86 pcs (580 W each)
  • Huawei inverter — 50 kW
  • Mounting — anodized aluminium / galvanized steel
  • Approximate installation area — 250 m² (roof)
  • Expected generation — 55,000 – 65,000 kWh per year

Payback period — individual*

Grid-tied solar power plant 100 kW

Turnkey SPP price — from $42,500 (depends on the roof type, length of cable runs, mountings, and connection conditions)

Price per 1 kW of installed turnkey capacity — from $425

SPP specifications:

  • Longi solar modules — 172 pcs (580 W each) → 99.76 kW DC in total
  • Huawei inverter — 100 kW (AC)
  • Mounting — anodized aluminium / galvanized steel (selected to suit the roof type)
  • Approximate installation area — ~500 m² (roof) (accounting for walkways/setbacks)
  • Expected generation — 110,000 – 130,000 kWh/year (depends on the region, orientation, angle, and shading)

Payback period — individual* (provided there is sufficient daytime consumption and current tariffs/electricity costs)

Grid-tied solar power plant 200 kW

Turnkey SPP price — from $85,000 (depends on the roof type, length of cable runs, mountings, and connection conditions)

Price per 1 kW of installed turnkey capacity — from $425

SPP specifications:

  • Longi solar modules — 344 pcs (580 W each) → 199.52 kW DC in total
  • Huawei inverter — 200 kW (AC) (a 2×100 kW configuration is possible depending on the project)
  • Mounting — anodized aluminium / galvanized steel (selected to suit the roof type)
  • Approximate installation area — ~1,000 m² (roof) (accounting for walkways/setbacks)
  • Expected generation — 220,000 – 260,000 kWh/year (depends on the region, orientation, angle, and shading)

Payback period — individual* (provided there is sufficient daytime consumption and current tariffs/electricity costs)

Why a business needs a solar power plant

Fast payback
Fast payback

The warranty service life of a solar power plant from LK Energy Group is 20 years. The project's payback period depends on the SPP's parameters, the load, insolation, and operating conditions*.

Savings on costs
Savings on costs

A solar power plant lets you save money on paying electricity bills - this way we can reduce the company's fixed costs and the cost of the products manufactured.

Energy independence
Energy independence

Solar power plants allow business owners to be independent of the energy companies' pricing policy, voltage fluctuations, and tariff fluctuations.

Made with solar power
Made with solar power

Products created with solar energy are a new eco-trend. And installing solar power plants improves the image of your business and increases its appeal to potential investors.

program-left
STAGES OF WORK FOR INSTALLING SOLAR POWER PLANTS
01/

Request and calculation

We determine the scope of work and the preliminary project costs.

02/

Plant design

We develop the technical project and agree it with the client.

03/

Documentation and permits

We prepare the documentation and obtain the permits for the construction of the plant.

04/

Equipment preparation

We select the solar panels, inverters, and other system components.

05/

Construction and installation

The start of construction work on the solar power plant components at the chosen site.

06/

Connection and configuration

We connect the SPP to the business's grid and configure it for optimal operation.

07/

Testing and inspection

We check the correctness and energy efficiency of the system's operation.

08/

Commissioning

And maintenance of the system for its best productivity and service life.

Our works

Turnkey solar power plants
Electrical installation works
Electrical installation works
Switchgear equipment
Turnkey solar power plants
Electrical installation works
Switchgear equipment

Frequently asked questions

A solar power plant lets you reduce electricity costs by up to 60–80%, protect yourself against rising tariffs, and increase the enterprise's energy independence.

On average — 5–6 years, depending on the cost of the equipment, the company's consumption, and the tariffs.

Yes, surpluses can be sold to the grid under commercial agreements with electricity supply companies or used for your own auxiliary needs.

You need to obtain the technical conditions for connection to the grid, agree the design documentation, conclude an agreement with the distribution system operator, and obtain the permit documents for commissioning.

A licence is required only for plants over 1 MW. For facilities of lower capacity, standard approvals are sufficient.

Approximately 2 ha of land per 1 MW, or 6–8 m² per 1 kW on rooftop structures.

Yes, hybrid solutions allow you to store energy and use it during peak load hours or during outages.

The warranty on the panels is 25 years, the actual service life is 30+ years. Inverters last on average 10–15 years.

The main risks are changes in legislation and tariffs, but they are offset by the long service life of the equipment and the reduction in operating costs.

Yes, banks offer special “green loans”, and there are also international support programmes and grant opportunities for Ukrainian enterprises.

Types of solar power plants installed on a turnkey basis

LK-Energy sells several types of power plants:

  • Large megawatt projects for commercial or industrial enterprises.
  • Small and medium energy systems for private households or small enterprises.
  • Small SPPs suitable for facilities with low electricity consumption.
  • Hybrid systems that combine panels with other energy sources, such as the common grid line, wind turbines, or diesel generators.

Factors that affect the price of a turnkey solar panel installation

The price of installing an SPP depends on several key factors. Firstly, it is the capacity of the system: the greater the required capacity, the higher the cost. Secondly, the choice of the type and quality of the panels, the inverter, and other system components has an impact.

The specifics of the installation can also affect the cost. For example, the accessibility of the roof or the plot of land, the complexity of connecting to the grid, and the need to use additional structures. Company experts also single out additional factors. Among them are the cost of the installers’ labour, tax incentives and subsidies, and the infrastructural features of the location.

What equipment is included in the supply package?

The package includes the following components:

  • panels (photovoltaic cells);
  • inverters (single-phase or three-phase);
  • mounting structures (ground or roof fixings);
  • electrical cables and connectors;
  • monitoring and control systems;
  • grounding and protective devices;
  • backup power and batteries (if required).

In addition, other components may be included in the calculation. For example, batteries for energy storage, as well as additional accessories for the safety and efficient operation of the SPP.

Where are turnkey solar panels installed?

The installation of a turnkey solar power plant can be carried out both on the roof of a building and on the ground, depending on the client’s requirements and the availability of a location for the panels. A turnkey solar power plant can also be installed on water surfaces. For example, on lakes and reservoirs, where floating platforms are mounted.

What documents are required for the construction of a turnkey SPP?

The company handles all matters related to preparing the documents for the construction of an SPP. Among them are:

  • a permit for the land plot and construction;
  • design documentation and technical specifications;
  • contracts with equipment suppliers and contractors;
  • a permit for connection to the electrical grid.

Additionally, approvals from energy regulators, environmental impact assessments, and approvals from the owners of the buildings or land where the turnkey solar panel installation will be carried out may be required.

A consultation with LK-Energy professionals will help in the process of collecting all the necessary documents and permits for the successful construction of an SPP. In conclusion, the managers provide the customer with a ready set of documentation.

Construction of solar power plants: stages of the work

The construction of a solar power plant goes through several stages:

  1. preparation and design;
  2. procurement and delivery of equipment;
  3. installation of panels and inverters;
  4. connection to the electrical grid and testing;
  5. obtaining the necessary permits and documents;
  6. commissioning and the start of electricity production.

At the final stage, the construction involves the start-up and commissioning of the system. After this, staff training in maintenance and management takes place.

Turnkey solar batteries: payback periods in Ukraine

In Ukraine, the equipment usually pays for itself over a period of 5 to 7 years; it all depends on several factors. Among them are the size and characteristics of the system, its cost, as well as the intensity of operation. LK-Energy staff point out that an important aspect is also the weather and climatic conditions.

Installation of turnkey solar power plants: timeframe for the work

The timeframe for the work varies depending on various factors, such as the size and complexity of the project, the availability of materials, weather conditions, and permit requirements.

Usually, building turnkey solar power plants requires from a few weeks to a few months. This includes the stages of planning, design, site preparation for installation, equipment installation, testing, and obtaining the necessary permits.